To carry
It is advised to start undergoing insulation after the construction gives a shrinkage (approximately a year after the end of construction work). At the same time, the building should be checked for the presence of a gap between the timber due to the shrinkage. When they appear, work is performed on the pounding of the cracks using tape packet, jagut fiber or other heater. Along with this, it is possible to carry out wall processing using a special antifungal and refractory agent, since in the future this procedure will not be possible.
Оставить комментарий