With a screw
2) check if any communications pass under the boards.
3) A hole is drilled in a beam, a nail is driven into it or screwed with a screw, the hats of which need to be buried into the surface of the bar, using a hydroelectric. This connection of the board with the beam will be the most reliable.
Оставить комментарий