Dry period and from
The design and construction of roads on salted soils should be preceded by laboratory analysis of soil soils should be removed from the upper horizons from a depth of 0.25-0.30 m to the dry period and from a depth of 0.5-0.6 m during the precipitation period.
Оставить комментарий