The preliminary seal

05.05.2017 | комментариев 0 | раздел: Стены

To reduce the risks of drawdown due to loads, the preliminary seal of the crushed stone layer until final leveling is also necessary. After such a seal, it is necessary to perform the layer with concrete, given that the concrete class should be higher into the thickness of the litter layer directly depends on the level of loads and the base.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...