Then work with

28.04.2017 | комментариев 0 | раздел: Стены

In any case, the repair should begin with the pondering of the estimate and the order of actions, and the priority tasks include the dismantling of all interfering structures and elements of the room. Then it is advisable to determine the places of the "global" accumulation of the solution and begin to equalize. In the meantime, in some areas, the thick layer of cement will dry out, you need to do as much work as possible with the walls, ceiling and floor. Pro AQ pipelines are the best solution if you do not want to change the pipes every five years. In this case, it is very important to determine the type of pipes in advance. Such rationalization will surely save the total repair time. If there are no serious levels of level in the room, there is also the need for thick aligning layers of plaster or screed, and the algorithm of actions will look much easier: ceiling, walls, floor. At the same time, finishing work is best distributed in the following order: working with cement, gypsum and putty mixtures, and only then work with wood (floor, doors with windows, slopes, and so on).

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...