They are not
After preparing the base of the mixture for alignment of the walls, they are not applied immediately. Initially measured changes under the entire length of the wall. For this, a long specification is usually used — the building level. Although in this procedure it is allowed to use any cord stretched along. The vertical of the wall surface is checked using a plumb line. If the detected differences do not exceed 30 mm, you can apply a wet mixture.
Оставить комментарий